| Sign In | Join Free | My spintoband.com |
|
Brand Name : Shuangjiu
Certification : ISO9001
Place of Origin : Shandong
MOQ : 5tons
Price : communication
Payment Terms : T/T,
Supply Ability : 1500 Ton/Tons per Week
Delivery Time : 7-15 days
Packaging Details : Standard export seaworthy packing.
Technique : Hot Rolled
Application : Construction Or Other Metal Structures
Tolerance : ±3%
Alloy Or Not : Non-Alloy
Length : Customers' Requirements
Payment Term : 30%T/T Advance + 70% Balance
Channel Steel Beam S235JR S275JR S355JR Hot-rolled Steel I-beams
Product description
I-beam, also known as steel beam, is a long steel strip shaped like i-beam. I - steel ordinary I - steel and light I - steel.
It is a steel section shaped like an I-beam. I steel is widely used in building and other metal structures.
Product details

Product parameter
| Product Name | Carbon Steel I-Beam |
| Standard | AiSi, ASTM, bs, DIN, EN, GB, JIS |
| Grade | Q235 SS400 S235JR Q345 A36 |
| Place of Origin | China |
| Brand Name | Shuangjius |
| Model Number | Q235 |
| Application | Construction |
| Tolerance | ±3% |
| Processing Service | Welding, Bending, Punching, Decoiling, Cutting |
| Alloy Or Not | Non-Alloy |
| Invoicing | by actual weight |
| Delivery Time | 7-15 days |
| MOQ | 1 Ton |
| Package | Standard Seaworthy Packing |
| Payment Term | 30%T/T Advance + 70% Balance |
| Shipment | Container or Bulk |
Product application

Our advantage
ONLINE SERVICE :We provide 7*24h online customer service.
FAST DELIVERY : Sufficient inventory to ensure fastdelivery.
OEM&ODM: Can be customized according to customer requirements.
QUALITY INSPECTION: Professional product quality inspection process.
FAQ
Q1:What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery.
Q2: What is the terms of trade?
A: EXW, FOB, CIF, CFR, DDU.
Q3: What is the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers'
requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after received your deposit. For productiong period, it
usually takes about 15-30 days afer receiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
|
|
Channel Steel Beam S235JR S275JR S355JR Hot-rolled Steel I-beams Images |